York planners have refused 20 aparthotel units and nine flats beside The Crescent music venue, saying the scheme failed to show future occupants would be protected from its noise.

York’s planners have refused plans for an aparthotel and flats beside The Crescent, the music venue off Blossom Street. The council decided that the scheme had not shown its future guests and residents would be protected from the venue’s noise, or that the venue would be protected from them.

The decision was issued on Friday 27 November by the council’s planning officers. It was not taken by a committee. The application was 25/01841/FULM for 9 The Crescent, the vacant former brewery buildings next door to the venue.

What was proposed

The officers’ report sets out the scheme. It would have kept the front of the old building and replaced most of the rest. It included:

  • 20 aparthotel units on the upper floors: 15 studios, three one-bedroom units and two two-bedroom units
  • nine flats: two one-bedroom flats on the ground floor and seven two-bedroom homes above, two of them duplexes
  • 550 square metres of commercial space on the ground and lower ground floors
  • a tallest block of five storeys at the front, with a sixth at the rear

Offices for the same site were approved in 2020 under reference 20/01411/FULM. The report says that scheme “has ultimately been deemed unviable” (officer report, 27 November 2026).

Why it was refused

The single reason for refusal is noise. The council said it was “not satisfied that future occupants of the proposed development would be protected from unacceptable levels of music noise and vibration, particularly in relation to low-frequency noise”. Nor was it satisfied that the development “would avoid placing unreasonable restrictions on the lawful operation of the neighbouring venue”.

That breaks the “agent of change” principle in national planning policy. Under it, whoever builds next to an existing pub, club or music venue is responsible for dealing with that venue’s noise, not the venue.

The council’s public protection officer visited The Crescent before giving final comments on 19 November. The report records what they found:

  • the venue operates until 4am, with music often on until 3.30am, but the noise assessments only went up to 2am
  • music played at event level was “clearly audible during the daytime and would likely be more dominant at night-time”
  • the officer felt vibration from the music, and remained “very concerned” it could travel through the ground into the new building
  • the low bass range was never assessed in a way that showed how loud it would be inside the rooms

The report says the applicant was given the chance to address the concerns, “however despite revised noise reports the issues were not sufficiently identified or addressed”. The planning file holds noise assessments dated from October 2025 to September 2026, and the officer’s final comments were on revision 9 of the noise report.

Officers also found a low level of harm to the conservation area from losing most of the old malthouse. They gave significant weight to reusing the site for homes and jobs. But they concluded those benefits did not outweigh the harm, given the venue is “a community venue of high public and cultural importance to the city”.

How many people objected

The planning file records 866 comments, from 881 people and bodies consulted. Of those, 862 were objections and none were in support.

Most objectors made the same point the council ended up making: that flats and hotel rooms next door would bring noise complaints that could threaten the venue’s future. The Micklegate Planning Panel objected too. It said it saw the need for a buffer between the venue and the accommodation, but wanted more flats and fewer aparthotel units.

What it means for you

  • The Crescent carries on as it is. Nothing in the decision changes how or when the venue can open.
  • The site stays empty for now. The former brewery buildings at number 9 remain vacant, and the 2020 office permission was described as unviable.
  • This may not be the end. The applicant can appeal to the Planning Inspectorate. For a refused planning application the deadline is normally six months from the decision (GOV.UK). A new application would also be possible.

The decision notice, the officer report and every noise assessment can be read on the council’s planning register.